Stakeholder Consultations

All our projects are aimed to have an impact beyond the mitigation of global warming. Stakeholder consultations ensure involvement of the local communities in the early stage of every emission reduction project. A local stakeholder consultation at one of our emission reduction projects in Thailand Find below South Pole's projects currently undergoing the stakeholder consultation process:

Kariba REDD+, Zimbabwe (uploaded 2011/09/05)
Stakeholders are invited for the Stakeholder Feedback Round.
Download CCBA PDD
I want to provide a comment

Asorpar Reforestation, Colombia (uploaded 2011/05/09)
Stakeholders are invited for the Stakeholder Feedback Round.
Download CCBA Monitoring Plan
I want to provide a comment

Nam Hong Hydropower, Vietnam (uploaded 2011/03/29)
Stakeholders are invited for the Stakeholder Feedback Round.
Download PDD
Download stakeholder invitation
Download stakeholder consultation report
Download non-technical description (Vietnamese/English)
Download Gold Standard passport
I want to provide a comment

Miaoli Wind Farm, Taiwan
Stakeholders are invited for the Stakeholder Feedback Round.
Download Stakeholder Invitation
Download non-technical description (trad. Chinese)
Download PDD
Download Gold Standard Passport
I want to provide a comment

Manggani Small Hydro, Indonesia
Stakeholders are invited for the Stakeholder Consultation Round.
Download non-technical description (English/Bahasa)
Download PoA description
Download CPA description
Download Gold Standard Passport
I want to provide a comment

Green Markets, Parå
Stakeholders are invited for the Stakeholder Consultation Round.
Download Invitation
Download non-technical summary (English and Portuguese)
I want to provide a comment

Metro Group Energy WWT Project (Gold standard 746)
Stakeholders are invited for the Stakeholder Feedback Round.
Download Stakeholder Consultation Report
Download Gold Standard Passport
Download non-technical summary (English)
Download non-technical summary (Thai)
Download PDD
I want to provide a comment

Tough Stuff Solar Panel and Lamp Sales, Madagascar
Stakeholders are invited to the Local Stakeholder Consultation that will take place on the 15th of December 2010 at 09.00 at Motel Anosy, Antanarivo.
Download invitation
Download non-technical description (French)
Download non-technical description (Malagasy)
I want to provide a comment

Blue Fire Bio wastewater treatment and biogas utilization project
(Gold Standard 662)

Stakeholders have been identified and invited to the Main Stakeholder Consultation.
Download PDD
Download Gold Standard Passport
Download Gold Standard Stakeholder Consultation Report
Download non-technical description (Thai)
Download non-technical description (English)
I want to provide a comment

Biomass Power in Thailand, generating electricity from coconuts residues (Gold Standard 792)
Stakeholders have been identified and invited to the Main Stakeholder Consultation which will start on the 8th of November 2010.
Download PDD
Download Gold Standard Passport
Download non-technical description (Thai)
Download non-technical description (English)
I want to provide a comment

Restoration of degraded areas and reforestation in Cáceres and Cravo Norte, Colombia
Stakeholder Consultation has started on 4th of October.
Download PDD
I want to provide a comment

Turbococinas, a rural cooking stove substitution program in El Salvador (Gold Standard 558 and 877)
Stakeholders have been identified and invited to the Main Stakeholder Consultation of this PoA and its first CPA. The Main Stakeholder Consultation will start on the 21st of June 2010 and will last until the 16th of August 2010.
Download PoA DD
Download CPA DD
Download CPA Gold Standard Passport
Download Stakeholder Consultation Report 1 for CPA
Download Stakeholder Consultation Report 2 for CPA
I want to provide a comment

Biogas utilization project in Zhejiang Jingxing Paper Joint Stock Co. Ltd.
A second round of Stakeholder Consultation has started. A public meeting will be held on the 15th of June 2010.
Download non-technical description in local language
Download invitation in local language
I want to provide a comment

Dora II 9.5 MWe Geothermal Energy Project
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded. The Main Stakeholder Consultation starts on the 15th of September 2010 and will last until November 16th, 2010.
Download the Gold Standard Initial Stakeholder Consultation Report
Download PDD
Download summary of PDD in local language (Turkish)
I want to provide a comment

Sustainable Small Hydropower Programme of Activities (PoA), Vietnam
Stakeholders are invited to the Local Stakeholder Consultation that will take place on the 24th of December 2009 at Bao Son Hotel, 50 Nguyen Chi Thanh, Hanoi, Viet Nam, from 8:30 to 11:30.
Download non-technical description (English)
I want to provide a comment

Hebei Yingxin Glass Group Co. Ltd. Glass Furnace Flue Gas Waste Heat To Energy Project, China
Stakeholders are invited to the Second Round Stakeholder Consultation that will take place on the 15th of December 2009.
Download Invitation Letter (Chinese/English)
Download non-technical summary (Chinese)
I want to provide a comment

Anbang Waste Gas to Energy Project, China
Download Stakeholder Consultation invitation (Chinese and English)
Download non-technical description (Chinese)
I want to provide a comment

Lucky Spinning Energy Efficiency Project, Thailand
Download Stakeholder Consultation schedule (English)
Download non-technical summary (English)
I want to provide a comment

Green Bio Energy 19 Biomass to Power Project, Thailand
Download Stakeholder Consultation invitation (Thai/English)
Download non-technical summary (Thai)
Download Agenda (English)
I want to provide a comment

Prony and Kafeate wind-farms, New Caledonia
(Gold Standard 566)

Stakeholders are invited to the Stakeholder feedback round that started on the 31st of July 2009 and will last until the 1st of October 2009.
Download PDD
Download Gold Standard Passport
I want to provide a comment

3.66MW poultry litter based power generation project
by Raus Power, India (Gold Standard 400)

Stakeholders have been identified and invited to the Main Stakeholder Consultation which will start on the 4th of May 2009 and will last until the 4th of July 2009.
Download PDD
Download Gold Standard Annex
Download non-technical summary
I want to provide a comment

Capture and use of biogas
in Venezuelan swine farms of Grupo la Caridad C.A

Stakeholders have been identified and invited to the Local Stakeholder Consultation which took place March, 6th 2009 .
Download Invitation and non-technical summary in local language
I want to provide a comment

Antai Group Waste Gas Recovery for Power Generation Project
(Gold Standard 605)

The Stakeholder Feedback Round has started on the 25th of April 2009. The commenting period is open until the 30st of June 2009.
Download non-technical project description in local language
Download Stakeholder Consultation Report
Download GS Passport
Download PDD
I want to provide a comment

Yanshuihe 1st Stage Hydro Power Station, China
(Gold Standard 667)

Key stakeholders have been identified and invited to the Local Stakeholder Consultation, which will take place on the 5th of March 2009.
Download the Invitation in local language
Download Non-technical Summary of the project in local language
Download Environmental Impacts Description in local language
Stakeholders are invited to provide their comments:
I want to provide a comment

Wanzhou Kehua Cement WHR to 13.5MW Electricity Project
in Wanzhou District, China (Gold Standard 475)

A second round of Stakeholder Consultation has started. A public meeting was held on the 17th of December 2008. The Main Stakeholder Consultation period started on the 1st of March 2009 and will last until 31st of May 2009.
Download the Invitation in local language
Download Non-technical Summary of the project in local language
Download 2nd Round Stakeholder Consultation Report
Download the PDD
Stakeholders are invited to provide their comments:
I want to provide a comment

InfraVest Changbin and Taichung bundled Wind Farms project, Taiwan
(Gold Standard 472)

The Main Stakeholder Consultation will start on the 3rd of December 2008 and will last until the 3rd of February 2009.
Download Stakeholder Consultation Report Changbin
Download Stakeholder Consultation Report Taichung
Download 2nd Round Stakeholder Consultation Report
Download Main Stakeholder Consultation Report
Download the PDD
Download Email Stakeholder Consultation Report
I want to provide a comment

Wu’an Municipality Tongbao Coking Oven and CDQ
Waste Heat Recovery Project, China (Gold Standard 402)

A second round of Stakeholder Consultation has started. A public meeting was held on the 20th of November 2008. The Consultation period will last until end of February.
Download the PDD
Download Report of the public meeting
I want to provide a comment

Guangzhou Zhujiang Beer Methane Recovery Project, China
(Gold Standard 401)

A second round of Stakeholder Consultation has started. A public meeting was held on the 26th of December 2008.
Download Invitation
Download the PDD Download 2nd Round Stakeholder Consultation Report
I want to provide a comment

Methane Recovery Project in Leachate
Treatment Process of Municipal Waste Incineration Power Plant Bundle

Key stakeholders have been identified and invited to the Local Stakeholder Consultation of Yixing, one project of the bundle. The meeting took place on December 25th, 2008.
Download the Invitation in local language
Download Non-technical Summary of the project in local language
Download Local Stakeholder Consultation Report (Yixing)
Key stakeholders have been identified and invited to the Local Stakeholder Consultation of Jiangyin, one project of the bundle. The meeting takes place on April 16th, 2009.
Download the Invitation in local language
Download Non-technical Summary of the project in local language
Stakeholders are invited to provide their comments:
I want to provide a comment

Hebei Xinpu Cement Co. Ltd. Waste Heat to Energy Project
(Gold Standard 624)

The Local Stakeholder Consultation has been concluded.
Project documentation is provided below. Comments are welcome:
Download GS-Passport
Download Local Stakeholder Consultation Report
I want to provide a comment

InfraVest Guanyin Wind Farm Project – Taiwan
InfraVest Hsinwu Wind Farm Project – Taiwan
(Gold Standard 612)

The Local Stakeholder Consultation has been concluded. The Stakeholder Feedback Round has started and will last until 14th of May 2009.
Project documentation is provided below. Comments are welcome:
Download GS-Passport
Download Local Stakeholder Consultation Report
Download PDD
I want to provide a comment

Tarnthanawat WWT, Thailand
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment

Saraff Biogas, Thailand
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment

Chantaburi Starch WWT and biogas utilization, Thailand
(Gold Standard 521)

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
The Main Stakeholder Consultation has started and will last until May 15, 2009.
Download the Gold Standard Initial Stakeholder Consultation Report
Download PDD
Download GS Annex
I want to provide a comment

Pitak Palm Wastewater Treatment and Biogas Utilization Project, Thailand
(Gold Standard 515)

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
The Main Stakeholder Consultation has started and will last until May 15, 2009.
Download the Gold Standard Initial Stakeholder Consultation Report
Download PDD
Download GS Annex
I want to provide a comment

Sukhothai Bioenergy Project, Thailand
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment

Beixu Group Methane to Energy Project
(Gold Standard 405)

A second round of Stakeholder Consultation has started. A public meeting will be held on the 23rd of February 2009. The Consultation period will last until 30th of April.
Download Invitation
Download PDD
I want to provide a comment

Eiamrungruang WWT and Biogas Utilization Project, Thailand
(Gold Standard 1063)

The Initial Stakeholder Consultation has been concluded.
The stakeholder feedback round will be held on 11 August 2011. The stakeholders will be invited to comment on the project for two months.
Download stakeholder consultation report
Download PDD
Download Gold Standard passport
I want to provide a comment

Agroipsa Forestry Project, Honduras
(Gold Standard)

A second round of Stakeholder Consultation has started. A public meeting was held on the 4th of August 2011.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment

Kariba REDD+ Project, Zimbabwe
Key stakeholders have been identified and invited to the Local Stakeholder Consultation, which will take place on the 22nd of September 2011.
Download stakeholder invitation in English
Download stakeholder invitation in Shona
Download Non-technical Summary of the project in English
Download Non-technical Summary of the project in Shona
I want to provide a comment



   Subscribe to our quarterly newsletter!