Gold Standard Stakeholder Consultations

Projects currently undergoing the Gold Standard stakeholder consultation process:


TPK Ethanol waste water treatment and biogas utilization project, Thailand

Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 20, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language


TPK Starch waste water treatment and biogas utilization project, Thailand

Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 19, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language


Chantaburi Starch WWT and biogas utilization, Thailand

Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 22nd, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language


Coronado Hydroelectric Project, Honduras

The Initial Stakeholder Consultation has been concluded.
The Main Stakeholder Consultation is being carried out from 30.07.2008 to 30.09.2008. The Project Design Document (PDD) and the non technical summary of the PDD in local language are provided below:.
Download the Gold Standard PDD draft
Download the non-technical PDD summary
Download the report from the Initial Stakeholder Consultation in local language 
I want to provide a comment


Pitak Palm Wastewater Treatment and Biogas Utilization Project, Thailand

Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on the 4th August 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language


Sukhothai Bioenergy Project, Thailand

Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on the 8th August 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language


103.5 MW Changbin Windfarm, Taiwan

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report 
I want to provide a comment


52.9 MW Taichung Windfarm, Taiwan

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report 
I want to provide a comment


KYP Biomass Project, Taiwan

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report 
I want to provide a comment


Jiabao 21 MW Wind Farm Project, Taiwan

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment


9.5 MW Geothermal Energy Project "Dora II", Turkey

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report 
Download the Gold Standard Initial Stakeholder Consultation Report in Turkish
I want to provide a comment


Beixu Group Methane to Energy Project, China

Key stakeholders have been identified. In addition to stakeholder meetings, they are welcome to submit comments in electronic form:
I want to provide a comment
Download Introduction to Project Design Document
Download Introduction to Environmental Impact of the Project (in Chinese)
Download the Gold Standard Initial Stakeholder Consultation Report


Suzhou Qizi Mountain Landfill Gas Recovery Project, Jiangsu, China

Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded. Stakeholders are invited to provide their comments within the framework of the Gold Standard Main Stakeholder Consultation:
I want to provide a comment
Download Introduction to Project Design Document
Download Project Design Document
Download Introduction to Environmental Impact of the Project
Download the Gold Standard Initial Stakeholder Consultation Report


Servifosas Biodigestor Project, Chile

The Initial Stakeholder Consultation has been concluded. The report from the Initial Stakeholder Consultation is provided below:
I want to provide a comment
Download Introduction to Project Design Document
Download Introduction to Environmental Impact of the Project (in Spanish)
Download the Gold Standard Initial Stakeholder Consultation Report