Gold Standard Stakeholder Consultations
Projects currently undergoing the Gold Standard stakeholder consultation process:
TPK Ethanol waste water treatment and biogas utilization project, Thailand
Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 20, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language
TPK Starch waste water treatment and biogas utilization project, Thailand
Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 19, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language
Chantaburi Starch WWT and biogas utilization, Thailand
Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on August 22nd, 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language
Coronado Hydroelectric Project, Honduras
The Initial Stakeholder Consultation has been concluded.
The Main Stakeholder Consultation is being carried out from 30.07.2008 to 30.09.2008. The Project Design Document (PDD) and the non technical summary of the PDD in local language are provided below:.
Download the Gold Standard PDD draft
Download the non-technical PDD summary
Download the report from the Initial Stakeholder Consultation in local language
I want to provide a comment
Pitak Palm Wastewater Treatment and Biogas Utilization Project, Thailand
Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on the 4th August 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language
Sukhothai Bioenergy Project, Thailand
Key stakeholders have been identified and invited to the Initial Stakeholder Consultation, which will take place on the 8th August 2008.
Stakeholders are invited to provide their comments:
I want to provide a comment
Download the Call for Invitation to the Initial Stakeholder Consultation in local language
103.5 MW Changbin Windfarm, Taiwan
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment
52.9 MW Taichung Windfarm, Taiwan
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment
KYP Biomass Project, Taiwan
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment
Jiabao 21 MW Wind Farm Project, Taiwan
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
I want to provide a comment
9.5 MW Geothermal Energy Project "Dora II", Turkey
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded.
Download the Gold Standard Initial Stakeholder Consultation Report
Download the Gold Standard Initial Stakeholder Consultation Report in Turkish
I want to provide a comment
Beixu Group Methane to Energy Project, China
Key stakeholders have been identified. In addition to stakeholder meetings, they are welcome to submit comments in electronic form:
I want to provide a comment
Download Introduction to Project Design Document
Download Introduction to Environmental Impact of the Project (in Chinese)
Download the Gold Standard Initial Stakeholder Consultation Report
Suzhou Qizi Mountain Landfill Gas Recovery Project, Jiangsu, China
Key stakeholders have been identified. The Initial Stakeholder Consultation has been concluded. Stakeholders are invited to provide their comments within the framework of the Gold Standard Main Stakeholder Consultation:
I want to provide a comment
Download Introduction to Project Design Document
Download Project Design Document
Download Introduction to Environmental Impact of the Project
Download the Gold Standard Initial Stakeholder Consultation Report
Servifosas Biodigestor Project, Chile
The Initial Stakeholder Consultation has been concluded. The report from the Initial Stakeholder Consultation is provided below:
I want to provide a comment
Download Introduction to Project Design Document
Download Introduction to Environmental Impact of the Project (in Spanish)
Download the Gold Standard Initial Stakeholder Consultation Report